| Date |
Event |
| 14.01.2003 |
S/N 10396: Calibrated by PTW. |
| 27.01.2003 |
S/N 10396: back from PTW. Batteries, NOVRAM, desiccant replaced. Amplifier sealed. |
| 16.10.2009 |
S/N 10398: back from PTW. Batteries, NOVRAM, desiccant, backlit display, keyboard, HV switch replaced. Chamber connector isolated. Calibrated. |
| 06.07.2011 |
S/N 10396: Sent to PTW via Siemens Austria. |
| 13.09.2011 |
S/N 10396: Calibrated by PTW. |
| 27.09.2011 |
S/N 10396: Back from PTW via Siemens Austria (duration:
16 weeks). |
| 2026 |
S/N 10396: Phased out due to increasing costs for verification and calibration. |