How is "downtime" defined for our Catalyst HD system?
C-Rad guarantees that downtime does not exceed 2% per year. The 2% are calculated based on 10 hrs per day, 5 days per week, 52 weeks per year. This gives 2600 hours of operational time per year. Planned downtime of 20 hours per year is allowed for maintenance. Two percent of 2580 hrs = 51.6 hrs. This is the allowed amount of unplanned downtime per year.
Date | Hours | Reason for Downtime |
---|---|---|
18.02.2016 | 3.5 | 12:30 GREEN: left camera power supply dead. We confirmed by 13:30 that fuse is good. PS will be sent (dt: 13:30 - 17:00). |
19.02.2016 | 4.0 | New power supply was delivered and installed. System is up again at 11:00 (dt: 7:00 - 11:00). |
11.03.2016 | 4.0 | 6:00 BLUE: "One or more Modules could not be initialized" (evening before: remote software update to 5.2.1). Fixed via rempte access (dt: 7:40 - 11:40). |
2016 | 11.5 | |
2017 | 0.0 | |
2018 | 0.0 | |
22.08.2019 | 0.17 | 11:22: "Unable to connect to the c4D Server" on both systems. (Server is virtualized.) Waited 10min, OK. |
09.10.2019 | 0.33 | 08:30 Green: USB connection failure. Power supply of right camera dead (gsm-testing). Replaced PS. |
2019 | 0.5 | |
11.03.2020 | 0.17 | 06:05: Keyboard/mouse unresponsive. Rebooted client. |
2020 | 0.17 | |
2021 | 0.0 |