Remarks
When interpreting the MLC problems, the following should be noted:
- If the system interrelations were better known (more thorough
understanding of the software during tthe first months), some problems could
have been avoided (e.g., WS COM timeout)
- Although there may be sometimes simpler ways to solve the
problem, reinitializing the MLC is usually the method of choice. Time delay
is quite short (3min).
- All repairs (except 2) were performed after the patient treatments.
- Having enough spare parts on site (e.g., SFBs) can drastically
reduce the "down-time" ...
(back)